About
Contact
info@ipmc-ng.com
Independent Project Monitoring Company
Home
About Us
Services
Engineering Support services
Project Administration
Project Management
Project Monitoring
Quality Assurance/Quality Control(Third Party Inspection)
Asset Integrity Management Services
Cost Engineering
Engineering Service
Detailed Engineering Design
Quality,Health,Safety & Environment
Safety, Health, and Environment Consultancy(COSHH)
Quality Management Systems Certifications
Environmental Management Systems
Risk Analysis Consultancy-HAZAN,HAZID etc
Data Management Services
Manpower Supply services
Financial Advisory Services
Sustainability
Environmental, Social & Governance Services
Environmental, Social & Governance
Environmental Performance Services
Social Performance Services
Our Portfolio
Careers
Media
News
Events
Photos
Downloads
Contact Us
Our Gallery
Home
Gallery
On Site Activity Photos
Inspection of Mechanical Installation, and Integrity of the tubing of the Manifold at the Reformer Plant
Inspection of Mechanical Installation and the Integrity of the tubing of the Manifold at the Reformer Plant
Inspection of the Ducting Installation works of the reformer Plant
Inspection of the Name Plate of the Pressure Vessel and the Equipment Data Sheet
Inspection Mechanical Installation, Integrity of Control Valves and the flanges of the Reformer Plant
Typical kentledge set up for pile load testing
Typical rebar arrangement for foundation mat base
Typical rebar fixing for piperacks & stanchions for elevated equipment
Installation and checks for piperack alignment
Typical installed equipment
Genset installation and voltage confirmation
Product tank nozzle and flange sizes verification
Site yard underground pipeline fabrication
Marine breakwater groyne, coastal protection and jetty works